Man Infraconstruction Limited Fair Value

MANINFRA · Realty · Current price ₹114.55

Full stock page
DocStoX fair value
₹65
medium confidence · 40/100
Current price
₹127
Upside to fair value
-48.8%
Estimate range
₹58 – ₹110
Quality score
4.3 / 10
Model it yourself — Margin of Safety Calculator
Opens pre-filled with Man Infraconstruction Limited's latest numbers.

Is Man Infraconstruction Limited undervalued?

We estimate the fair value of Man Infraconstruction Limited at ₹65 per share, against a market price of ₹127. That puts the share price about -48.8% above our estimate, at medium confidence. This is our view of what the business is worth, not a target price or a forecast of where the share price will go.

How this fair value is calculated

This estimate comes from 1 method: Residual income (legacy engine) (₹65). Each is weighted by how well its inputs held up for this company. The full working, including the assumptions and what data was missing, is set out below.

The range around this estimate

Our estimate for Man Infraconstruction Limited spans ₹58 to ₹110. A margin of safety means buying meaningfully below the estimate: the wider the range, the more room the assumptions leave for error.

How we got this fair value

Every number below is part of the same estimate for Man Infraconstruction Limited. Nothing here is a target price or a forecast of where the share price will go.

Medium confidence40/100

Workable, with real gaps. Weigh it alongside your own view rather than on its own.

Estimate range ₹58 – ₹110

Why this method for this business

The legacy residual income model is appropriate for a realty company with a focus on book value and residual income, given the lack of forward estimates and the need to anchor valuation to fundamentals.

The models behind the number

Each method is weighted by how well its inputs held up for this company.

Residual income (legacy engine)
₹65100% weight

Book-value residual income with per-category routing (legacy engine)

  • DCF is not suitable due to the lack of forward estimates and the cyclical nature of the realty sector.
  • P/E or EV/EBITDA are not applicable due to the lack of forward earnings and the volatility of the sector.

What was missing

  • Forward estimates
  • Detailed project pipeline
  • Detailed cost of equity assumptions

What drives it

3 inputs, grouped by how strong each claim is
MacroEconomy-wide input, not company-specific.
Cost of equity
12.5%

building-block

JudgementOur read of the evidence, not a measurement.
Moat
None

computed

Uncertainty
High

computed

Who computed this

A language model (qwen3:8b) selects the valuation method and the judgement inputs for Man Infraconstruction Limited: which models suit the business, the moat, the growth and margin assumptions. It does not produce the number. The fair value itself is computed in Python by a deterministic engine (version 2026.08.1) from those inputs, so the same inputs always give the same result and every figure above can be traced to a source.

Estimated 15 Sept 2026. Re-run as new financials and news arrive.

How we value stocks

We estimate what a business is worth from its own economics: cash flows, returns on capital, and a multiple justified by its quality, rather than from where the share price has been. A fair value estimate is a view, not a verdict, and it is only as good as the inputs listed above.

Read the full fair-value methodology

More on Man Infraconstruction Limited

DocStoX estimates are computed from reported financials, for informational purposes only, not investment advice. Consult a SEBI-registered advisor before investing.