IRB Infrastructure Developers Limited Intrinsic Value

IRB · Construction · Current price ₹17.63

Full stock page
DocStoX fair value
₹15
low confidence · 32/100
Current price
₹20
Upside to fair value
-23.6%
Estimate range
₹13 – ₹17
Quality score
4.0 / 10
Model it yourself — Intrinsic Value Calculator
Opens pre-filled with IRB Infrastructure Developers Limited's latest numbers.

Is IRB Infrastructure Developers Limited undervalued?

We estimate the fair value of IRB Infrastructure Developers Limited at ₹15 per share, against a market price of ₹20. That puts the share price about -23.6% above our estimate, at low confidence. This is our view of what the business is worth, not a target price or a forecast of where the share price will go.

How this fair value is calculated

This estimate comes from 2 methods: Discounted cash flow (2-stage) (₹13), Fair multiple (P/E) (₹25). Each is weighted by how well its inputs held up for this company. The full working, including the assumptions and what data was missing, is set out below.

The range around this estimate

Our estimate for IRB Infrastructure Developers Limited spans ₹13 to ₹17. That range is wide, which is the honest signal here: read the range rather than the single number. A margin of safety means buying meaningfully below the estimate: the wider the range, the more room the assumptions leave for error.

Margin of safety

Value investors look for a margin of safety: a discount to estimated value that absorbs being wrong. At ₹20 against an estimated value of ₹15, IRB Infrastructure Developers Limited trades at -23.6%, i.e. a premium to our estimate. How much margin to demand depends on how much you trust the inputs, which is what the confidence band below is for.

How we got this fair value

Every number below is part of the same estimate for IRB Infrastructure Developers Limited. Nothing here is a target price or a forecast of where the share price will go.

Low confidence32/100

The inputs are thin or the models disagree sharply. This is our least reliable kind of estimate, so read the range rather than the single number.

Estimate range ₹13 – ₹17

Why this method for this business

The DCF model is appropriate for a capital-intensive construction company with predictable cash flows, while EV/EBITDA and relative P/E provide market-based benchmarks for valuation.

The models behind the number

Each method is weighted by how well its inputs held up for this company.

Discounted cash flow (2-stage)
₹1360% weight

Intrinsic value from 2-stage discounted cash flows (primary for asset-light / normal businesses); FCFE path

Fair multiple (P/E)
₹2510% weight
EV / EBITDA(not enough data)

required inputs missing

  • Discounted cash flow (2-stage) is already used as the primary model, but we refine it with EV/EBITDA and relative P/E for a more balanced view.

What was missing

  • Lack of forward EPS estimates
  • Limited analyst coverage for precise multiple normalization
  • Insufficient historical data on debt-to-equity ratios for capital structure analysis

What drives it

27 inputs, grouped by how strong each claim is
ReportedRead from filings or market data. Verifiable, not our opinion.
FCF_0 (normalized)
1,065 ₹cr

fcf_norm (median ≤5y positive)

Net debt
20,027 ₹cr

gross debt (cash n/a)

Sector-median P/E
23.22×

peer-median

Peers used
16

peer-median

EPS (TTM)
0.79 ₹/share

computed

Own-history median P/E
41.92×

reconstructed (one feature, dampened — not a cap)

MacroEconomy-wide input, not company-specific.
Discount rate (r)
14.4%

COE (building-block)

Beta
1

bottom-up industry

AssumptionA forward input the model chose. Reasonable people can disagree here.
Stage-1 start growth
14%

pat_cagr_5y

Fade shape
linear

lifecycle Mature

Terminal growth (g)
4.87%

macro terminal × quality premium

Stage-1 years
8 y

lifecycle Mature horizon

JudgementOur read of the evidence, not a measurement.
Lifecycle stage
Mature

forecast engine (L20)

Quality premium
0.975×

moat None + capital allocation

Term: quality
-5.3%

quality 44/100 (weak/erratic returns) → discount

Term: growth
+20.2%

durable ~28% CAGR (ROCE 9% < 12% hurdle (growth not value-accretive)) → premium

Term: capital_allocation
-7.0%

capital allocation: falling ROCE / weak cash generation → discount

Term: financial_strength
+2.1%

financial strength: low leverage (D/E 0.7) → mild premium

Term: history
+24.1%

history: market paid +81% vs sector, dampened ×0.3 (one feature, not the anchor)

Term: sector_rerating
+0.0%

sector re-rating: no sector-norm history → not used

Term: rate_regime
+1.2%

rates: risk-free 6.9% below ~7.1% normal → higher multiple

Term: risk
+0.0%

risk: no analyst-dispersion signal available → neutral (lowers confidence, not PE)

DerivedFalls out of the inputs above: a model output, not an independent input.
Path
FCFE

computed (D/E vs 0.8)

Terminal-value fraction
0.523

PV_TV / (PV_1+PV_TV)

Premium vs sector
+35.8%

fundamentals + macro (not capped at own history)

Fair-multiple confidence
80%

data completeness + term agreement

Fair P/E
31.54×

sector median × ∏(1+term) — Dynamic Fair Multiple

Who computed this

A language model (qwen3:8b) selects the valuation method and the judgement inputs for IRB Infrastructure Developers Limited: which models suit the business, the moat, the growth and margin assumptions. It does not produce the number. The fair value itself is computed in Python by a deterministic engine (version 2026.08.1) from those inputs, so the same inputs always give the same result and every figure above can be traced to a source.

Estimated 14 Sept 2026. Re-run as new financials and news arrive.

How we value stocks

We estimate what a business is worth from its own economics: cash flows, returns on capital, and a multiple justified by its quality, rather than from where the share price has been. A fair value estimate is a view, not a verdict, and it is only as good as the inputs listed above.

Read the full fair-value methodology

More on IRB Infrastructure Developers Limited

DocStoX estimates are computed from reported financials, for informational purposes only, not investment advice. Consult a SEBI-registered advisor before investing.